Guide · Timelines
How long it takes to build a website, from the day the content lands
How long does it take to build a website? Two to three weeks for four pages, four to six for ten, six to ten for a shop. Every one of those counts from the day your content arrives, not the day you pay, and the gap between those two dates is where timelines slip.
The four-page site, week by week
A four-page site is home, about, services and contact, and with me it is £795 built and live. Here is where the two to three weeks go.
Before the clock starts. You tell me what the site is for, which takes about an hour in writing, and you send the content: the words for each page, the photographs, the logo, the phone number and the address you want shown. The day that lands is day one.
Week one. I build the pages on a theme I maintain, so the structure, the speed and the phone number in the header are already decided and tested. You get a staging link before the week is out, which means you watch the site take shape rather than waiting for a reveal.
Week two. Your first round of changes, then mine. Most sites need one round; the price includes two. Search Console and analytics are set up in your name, the domain is pointed, and I record the walkthrough that shows you how to change your own text.
Week three, if it is needed. A second round of changes, or waiting for a photograph that was promised in week one. Then it goes live and moves onto management.
Why ten pages takes twice as long
Up to ten pages is £1,650 and four to six weeks, and the extra time is not the extra pages. Four pages describe a business. Ten pages describe each thing the business does, one per page, so that each one can be found separately. Writing a page that is about one service, and only that service, takes longer than writing a page that lists all six, and it is the only version worth paying for, because a page that lists six things tends to rank for none of them.
There is also more to agree. Ten pages means a navigation that has to hold them, a decision about which services get a page and which get a paragraph, and a structure that leaves room for the eleventh page without a rebuild. Those conversations are the second and third week. The build itself is not much slower than the four-page site; the thinking is.
Why a shop takes six to ten weeks
A shop from £2,750 is six to ten weeks because a shop has to take money, and nothing that takes money goes live on a guess. Every size variant has to exist, every shipping band has to be right, the refund and terms pages have to be published, the checkout has to be tested with real payments switched on, and the old URLs, if there was an old shop, have to redirect so the search standing survives the move.
Product count moves the date more than anything else. A short range with good photographs loads quickly; a long one from a spreadsheet of inconsistent sizes is most of the gap between six weeks and ten. If your stock lives in another system and has to sync, that is its own job with its own testing, and I will say so when I quote rather than when it slips.
The other thing that moves a shop’s date is the pre-launch audit. I do not launch a store until every page a customer could reach has been walked through on a phone, and that audit is the difference between a launch and a weekend of apologies.
Your content sets the date
Every timeline on this page starts from the day your content lands, and that sentence does more work than any other on the page. The site cannot be built around words that do not exist yet. A build quoted at three weeks that waits five weeks for the about page is an eight-week build, and the five weeks were yours.
Page copy is in the build price, so if you cannot write it, I will, from a conversation and whatever you already have. What I cannot do is invent your photographs, your prices or your opening hours, and those are the three things that most often arrive last. Gather them before you commission the site and the timeline on this page holds.
What slows it down, and what doesn’t
Slows it down. Content arriving in pieces. A decision made in week one and reversed in week three. A photograph session booked after the build starts. A third person who has to approve things and was not in the first conversation. A domain nobody can find the login for. Each of these is ordinary, and each one adds days.
Doesn’t. How ambitious the design is, within reason; the theme carries that. The number of revisions, as long as they come as a round rather than a trickle. Whether you are in Fakenham or Falkirk; the work happens over email, a staging link and screen share wherever you are. How busy I am, because I take fifteen clients at a time and say no when I am full rather than take the job and miss the date.
If you want a date rather than a range, send me what you have and tell me what is still to come. I will give you a timeline that starts from the day the last of it lands, with the price beside it from the pricing page.
Also worth reading: WordPress vs Shopify: which one a small business should build on, and do I need a website for my business? Sometimes the answer is no.